City of North Miami basin 5 drainage improvements
CLIENTS:
PALM ENGINEERING GROUP
CITY OF NORTH MIAMI
LOCATION:
NORTH MIAMI, FLORIDA
ESTIMATED CIVIL CONSTRUCTION COST:
$2,500,000
PROJECT DESCRIPTION / SCOPE OF WORK:
TO IMPROVE WATER QUALITY AND FLOOD CONTROL FOR 7 PROBLEM STREETS WITHIN THE CITY OF NORTH MIAMI'S BASIN #5 (CITY OF N. MIAMI STORM WATER MASTER PLAN). SCOPE OF WORK INCUDES BEST MANAGEMENT PRACTICES FOR WATER QUALITY AND FLOODING MITIGATION FOR PROBLEM AREAS. ROSS ENGINEERING'S SCOPE OF WORK INCLUDES THE ANALYSIS, DESIGN AND PERMITTING OF TWO DRAINAGE WELLS ON NE 14TH AVENUE AND A STORMWATER PUMPSTATION (FLYGHT PUMPS) WITH A 7.5 HP PUMP AND 200 LF FORCE MAIN ON NE 136TH STREET. PALM ENGINEERING (PRIME CONSULTANT) IS RESPONSIBLE FOR THE PROJECT MANAGEMENT, WATER QUALITY AND FLOOD DESIGN DRAWINGS FOR ALL SEVEN STREETS INCLUDING DERM PERMITTING.
Project Drawing PDF Files
City of North Miami Basin 5 Drainage Improvements Well Detail Drawing



