BROWARD COUNTY PUBLIC SCHOOLS Colbert Elementary School PHASE II CLIENTS: LOCATION: Hollywood, FL ESTIMATED CIVIL CONSTRUCTION COST: $2,000,000 |
PROJECT DESCRIPTION / SCOPE OF WORK: Site drainage for the 4.36 acres (Phase II) is proposed to be handled with a combination of proposed exfiltration trenches, one fenced dry retention area, Underground Stormtech Rain Tank System under playfield, and strategically placed yard drains to pickup excessive runoff from open space and roof runoff tie-ins. Existing stormwater drainage system includes a retention area, underground stormtech system in main parking lot and drainage structures that cover approximately 5.19 acres (Phase I is currently under construction) of the total site (9.55 acres in total). UTILITIES INCLUDE UTILIZING AN ONSITE LIFTSTATION WITH SANITARY LATERAL TIE-INS TO THE ONSITE SANITARY SEWER MAIN AND WATER CONNECTIONS ARE ALSO TO TIE INTO THE EXISTING ONSITE WATER MAIN LOOP.
|