USGBC LEED for NEW CONSTRUCTION: SS Credit 6.1
Intent
-
Limit the disruption of natural hydrology
-
Increase on-site filtration
-
Manage storm water runoff
-
Eliminate sources of contaminants
-
Reduce impervious cover
-
Reduce/eliminate pollution
-
Remove pollutants from storm water runoff
Stormwater Design (for reduction of impervious surface)
-
alternative surfaces: rain gardens, vegetated swales, rainwater recycling
-
non-structural surfaces: vegetated roofs, pervious pavement, grid pavers
Implementation
1. case 1: impervious surface less than or equal to 50% of total site area
-
post-development peak discharge rate and quantity equal to or less than pre-development (for 1 and 2 year, 24-hour design storms)
-
implement a stormwater management plan that protect receiving stream channels from excessive erosion by implementing a stream channel protection strategy and quantity control strategies.
2. case 2: impervious surface more than 50% of total site area
-
post-development peak discharge rate and quantity 25% less than pre-development (from the two-year 24-hour design storm)