Mastec-Lift-Station

mastec lift station

 

CLIENT:

A-1 UNDERGROUND

LOCATION:

DAVIE, FLORIDA

ESTIMATED CONSTRUCTION COST:

$500,000

PROJECT DESCRIPTION / ENGINEERING SCOPE OF WORK:

Designed and permitted the lift station, and utility design for this mastec lift station project. Utility design included a sanitary sewer plan & Profile. lift station design included a lift station plan, lift station details and calculations.

Project Drawing PDF Files

Mastec Lift Station Plan