SEMINOLE BRIGHTON RESERVATION ELDER CENTER


CLIENTS:
SEMINOLE TRIBE OF FLORIDA
GULF DESIGN / GULF BUILDING CORP
LOCATION:
BRIGHTON RESERVATION, FLORIDA
ESTIMATED CONSTRUCTION COST:
$6,000,000
PROJECT DESCRIPTION / ENGINEERING SCOPE OF WORK:
Designed and permitted the paving, grading, drainage, and utility design for this Seminole Indian Reservation project. Utility design included tying into an existing lift station and a capacity analysis was performed for the station. Stormwater design included onsite retention coupled with a control structure with discharge to an adjacent ditch was provided for adequate flood control and water quality for the Public Safety complex.
Project Drawing PDF Files
Seminole Indian Brighton Reservation Elder Care Center Pavement, Marking and Signing Drawing



