700 LINCOLN ROAD PROJECT FLOOD DRAINAGE

CLIENT: Kobi Karp Architecture

LOCATION: MIAMI BEACH, FLORIDA

ESTIMATED CIVIL CONSTRUCTION COST: $200,000

PROJECT DESCRIPTION / SCOPE OF WORK:

Contracted as a flood engineer for the design permit civil site work for this 1.1 acre site in Miami Beach, Florida. Our engineering scope of work included paving, grading, and drainage design including a storm water injection drainage well to meet the requirements for flood control and best management practices for water quality including dry pre-treatment. A water and sewer plan was included to provide drinking water, fire flow for sprinkler system and sanitary sewer. The construction engineering administration work included site inspections within the City of Miami Beach and Miami-Dade County. as Flood engineer we were able to successfully closeout all permits with DERM and FDEP and the property is draining its roof water directly into the drainage well in the alley.