LIFT STATION DRAINAGE PROJECT FOR MASTEC

CLIENT: A-1 UNDERGROUND

LOCATION: DAVIE, FLORIDA

ESTIMATED CONSTRUCTION COST: $500,000

PROJECT DESCRIPTION / ENGINEERING SCOPE OF WORK:

Hired as the lift station engineer and designed and permitted the lift station, and utility design for this mastec lift station project. Utility design included a sanitary sewer plan & Profile. lift station design included a lift station plan, lift station details and calculations.  Services included sizing pumps and sizing force main connection. Facility was on septic and was forced to tie into town utilities by the Health Department

Project Drawing PDF Files

Mastec Lift Station Plan