LIFT STATION DRAINAGE PROJECT FOR MASTEC
CLIENT: A-1 UNDERGROUND
LOCATION: DAVIE, FLORIDA
ESTIMATED CONSTRUCTION COST: $500,000
PROJECT DESCRIPTION / ENGINEERING SCOPE OF WORK:
Hired as the lift station engineer and designed and permitted the lift station, and utility design for this mastec lift station project. Utility design included a sanitary sewer plan & Profile. lift station design included a lift station plan, lift station details and calculations. Services included sizing pumps and sizing force main connection. Facility was on septic and was forced to tie into town utilities by the Health Department
Project Drawing PDF Files