SANITARY SEWER EVALUATION SURVEY FOR MIAMI DADE WASD
CLIENT INFORMATION:
Client Name: Miami Dade Water and Sewer Department
WASD PM: Rodney Lovett, P.E.
Client Address: 20900 SW 117 Avenue,Miami, FL 33177
Phone Number: 786-268-5025
Completion Date: August 2012
Total Fees Paid to Firm: $400,000
PROJECT SCOPE OF WORK:
Ross Engineering’s scope as Construction Engineering Manager included a detailed sanitary sewer evaluation survey for manholes, pump station wet well, sewer gravity main cleaning and CCTV inspection. This project was the first of a two step process to reduce I/I. In accordance with MDWASD’s guidelines, the project helped identify specific repairs through the manhole, pump station, and CCTV inspections. The second portion of the project includes the repair of the identified defects. Cleaning and inspection procedures were conducted in accordance with the contract specifications while minimizing inconvenience to residents. All defects identified were logged into a database provided by MDWASD and repair recommendations were determined using MDWASD ‘S Repair Criteria and Technology Guidelines. sanitary sewer evaluation survey.
NASSCO Certified Staff at Ross Engineering: Melissa Ross, MSCE