ST PATRICK’S PRE SCHOOL TRAFFIC CALMING DRAINAGE

CLIENTS: ARCHDIOCESE OF MIAMI
KOSINSKI ARCHITECTURE

LOCATION: MIAMI BEACH, FLORIDA

ESTIMATED CONSTRUCTION COST: $5,500,000

PROJECT DESCRIPTION / SCOPE OF WORK:

Ross was hired as the civil engineering consultant for the traffic calming design of onsite and offsite site plan to convert Meridian Avenue into a private street with traffic calming and angled parking. Our scope of work includes roadway geometry, offsite and onsite drainage, onsite utilities, offsite design of city water main and sewer main extensions, traffic control, signage and markings. In addition to traffic calming is to include permitting through Miami-Dade County Traffic Signals and Signs, City of Miami Beach, DERM, WASD, Health Department, and SFWMD.